翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

project delivery method : ウィキペディア英語版
project delivery method
A project delivery method is a system used by an agency or owner for organizing and financing design, construction, operations, and maintenance services for a structure or facility by entering into legal agreements with one or more entities or parties.
== Types ==

Common project delivery methods include:
; Design-Bid-Build (DBB) or Design-Award-Build (DAB)
: An owner develops contract documents with an architect or engineer consisting of a set of blueprints and a detailed specification. Bids are solicited from contractors based on these documents; a contract is then awarded to the lowest responsive and responsible bidder.
; DBB with Construction Management (DBB with CM)
: With partially completed contract documents, an owner will hire a construction manager to act as an agent. As substantial portions of the documents are completed, the construction manager will solicit bids from suitable subcontractors. This allows construction to proceed more quickly and allows the owner to share some of the risk inherent in the project with the construction manager.
; Design-Build (DB) or Design-Construct
: An owner develops a conceptual plan for a project, then solicits bids from joint ventures of architects and/or engineer and builders for the design and construction of the project.
; Design-Build-Operate-Maintain (DBOM)
: DBOM takes DB one step further by including the operations and maintenance of the completed project in the same original contract.
; Build-Operate-Transfer (BOT)
: BOT represents complete integration of the project delivery: the same contract governs the design, construction, operations, maintenance and financing of the project. After some concessionary period, the facility is transferred back to the owner.
; Integrated Project Delivery (IPD)
: A project delivery method in which the interests of the primary team members are aligned in such a way that the members can be integrated for optimal project performance resulting in a collaborative, value-based process delivering high-outcome results to the entire building team.〔(【引用サイトリンク】 work=American Institute of Architects California Council May 15, 2007 )〕〔(【引用サイトリンク】 work=American Institute of Architects 2007 version 1 )〕〔(【引用サイトリンク】 work=Lean Construction Institute Nov. 18, 2004 )〕